Design Workshop


Design Workshop Dives In

Renewing the 1935 Highbridge Pool and Play Center this summer.


Launch of Energy Measurement for our SCE Building

The Design Workshop ’09 team is proud to announce that the 25 East 13th Building Dashboard system is now fully operational. This system was installed as a tool for administration, facilities staff, and students to help understand and track energy consumption.  We hope this can be a device that can …


Design Workshop 2009: CONNECT 4LOOR

(All Photos by Michael Moran)Visit the Design Workshop Page :The 2009 Design Workshop undertook the complete renovation and transformation of the design studios of the School of Constructed Environments at Parsons The New School for Design. This work entailed rethinking the nature of the design studio in the 21st century …